Title:
Batch scheduling of two-machine limited-buffer flowshop with setup and removal times
Batch scheduling of two-machine limited-buffer flowshop with setup and removal times
dc.contributor.advisor | Zhou, Chen | |
dc.contributor.author | Dai, Jianbin | en_US |
dc.contributor.department | Industrial and Systems Engineering | en_US |
dc.date.accessioned | 2005-03-10T18:26:13Z | |
dc.date.available | 2005-03-10T18:26:13Z | |
dc.date.issued | 2003-12-01 | en_US |
dc.description.degree | Ph.D. | en_US |
dc.format.extent | 1056317 bytes | |
dc.format.mimetype | application/pdf | |
dc.identifier.uri | http://hdl.handle.net/1853/5331 | |
dc.language.iso | en_US | |
dc.publisher | Georgia Institute of Technology | en_US |
dc.subject | Scheduling Computer programs | en_US |
dc.subject | Mathematical optimization | |
dc.title | Batch scheduling of two-machine limited-buffer flowshop with setup and removal times | en_US |
dc.type | Text | |
dc.type.genre | Dissertation | |
dspace.entity.type | Publication | |
local.contributor.advisor | Zhou, Chen | |
local.contributor.corporatename | H. Milton Stewart School of Industrial and Systems Engineering | |
local.contributor.corporatename | College of Engineering | |
relation.isAdvisorOfPublication | d3fcaab8-8f24-4841-aa20-e37717ec151d | |
relation.isOrgUnitOfPublication | 29ad75f0-242d-49a7-9b3d-0ac88893323c | |
relation.isOrgUnitOfPublication | 7c022d60-21d5-497c-b552-95e489a06569 |
Files
Original bundle
1 - 1 of 1
- Name:
- dai_jianbin_200312_phd_edit.pdf
- Size:
- 3.38 MB
- Format:
- Adobe Portable Document Format
- Description: