Increasing Throughput Capacity at a Walmart.com Distribution Center
Loading...
Author(s)
Boliere, Anne S.
Brown, Sheereen
King, Matthew
MacGowan, Virginia
Solana, Jessica
Thaliath, Catherine S.
Ulloque, Victoria
Advisor(s)
Editor(s)
Collections
Supplementary to:
Permanent Link
Abstract
The goal of the project was to increase throughput capacity at the Walmart.com distribution center in Carrollton, GA. The team utilized various methodologies to develop tools and pick module designs as deliverables. By applying these recommendations, the DC is projected to increase throughput by 32% with an estimated annual savings of $6.9M.
Sponsor
Date
2012-12-12
Extent
16:01 minutes
Resource Type
Moving Image
Text
Text
Resource Subtype
Poster
Presentation
Presentation